Skip to main content
Home

Utility Menu

  • Contact Us
  • Offices

Main navigation

  • About Us
    • Companies
    • Corporate Responsibility
    • Our Story
    • Building What Matters
  • Our Work
    • Markets
    • Expertise
    • Projects
  • Business With Us
    • Strategic Partnership Program
    • Suppliers
    • Trade Contractors
  • Build Your Career
    • Life at Clark
    • #OneClark
    • Search & Apply
    • Recent Graduates
  • News
  • Image

    ballston
    Ballston Quarter Renovation
    … installation – specifically, the chance of a road collapse during bridge transportation due to voids or utilities under the road. By utilizing ground penetrating radar along the travel …
  • Image

    The International Spy Museum
    International Spy Museum
    … potentially lead to overstressing the steel and glass components. The complexity of the system did not end with the design. Craftsmen installed the veil using mobile cranes and boom lifts at …
  • Image

    UW Seismic Improvements
    UW Seismic Improvements
    … former gymnasium was subdivided, and an interstitial floor was added. However, the new floor did not align with the original floors, complicating the site investigations and building …
  • Image

    Tysons Central
    Tysons Central
    … and an adjacent 4.2 million-square-foot development that features a variety of shopping, dining, and entertainment options.    The 8th floor sky lobby features an outdoor terrace with …
  • Image

    Australian Embassy
    New Australian Embassy
    … safety planning to address challenges posed by the site's constraints, ensuring that operations did not compromise the safety of workers or the integrity of surrounding structures. Building …
  • Image

    Fostering Inclusion: The Importance of Networks and Mentorship
    Fostering Inclusion: The Importance of Networks and Mentorship
    … the 'jungle gym' of opportunities in construction." - Monique Holley, Senior Superintendent How did you get connected with your mentor? "I have two people that I consider mentors in my … to us about her experience at the company and she later sat with me during a lunch break. I didn't have industry internship experience. Most of my industry knowledge came from college …
  • Image

    Skymark Reston Town Center
    Skymark at Reston Town Center
    … detailed planning to ensure the local concrete plant could meet the needs of the large pours. Due to significant wind loading on the tall structure, there were also large, custom-welded …
  • Image

    Dwight D. Eisenhower Memorial
    Dwight D. Eisenhower Memorial
    … working level, where it was installed by workers standing on top of the columns while securely tied off with a safety system and in-man lifts. The entire tapestry system, made up of 604 …
  • Image

    Clark Constructs World’s Longest Pedestrian Walkway Over an Active Airport Taxi Lane at Seattle-Tacoma International Airport
    Clark Constructs World’s Longest Pedestrian Walkway Over an Active Airport Taxi Lane at Seattle-Tacoma International Airport
    … International Airport (SEA) is forever changed following the recent erection of a new elevated pedestrian walkway at the south end of the airport. The expansive steel structure, which … milestone in the construction of the project: moving and hoisting the center section of the pedestrian walkway into place. The highly complex operation required years of thoughtful … IAF. “Our primary objective was to ensure that we executed the work according to our plan and did so safely, with minimal impact to airport operations. It took everyone – Clark, the Port, …
  • Image

    Capturing Reality: How Technology, People, and Planning are Coalescing in the Age of Information
    Capturing Reality: How Technology, People, and Planning are Coalescing in the Age of Information
    … that inspire the imagination, unforeseen conditions and complex operations challenge teams to dive deep into the planning process. That’s where reality capture comes in. Reality capture …

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 66
  • Page 67
  • Page 68
  • Page 69
  • Page 70
  • Page 71
  • Page 72
  • Current page 73
  • Page 74
  • Next page Next ›
  • Last page Last »

© 2000-2026 Clark Construction Group, LLC

Part of the Clark Group portfolio of companies.

Social Media

  • Facebook
  • X
  • Instagram
  • LinkedIn
  • YouTube

 

Privacy Notice