WSSC Parkway Substation
Location:
Laurel, Maryland
Client:
Singleton Electric Company, Inc. / Washington Suburban Sanitary Commission (WSSC)
Year Completed:
2021
Sector:
Clark Water provided a turn-key solution on a design-build contract to Singleton Electric at the WSSC Parkway Plant in which the entire electrical distribution system was replaced.
The Clark team self-performed all duct bank excavation, backfill, and concrete for the project as well as all site work, drainage, and the replacement of the cast-in-place concrete electrical substation while maintaining active treatment plant operations.