Client
Board of Regents for the University of California
Designer
Moore Ruble Yudell Architects & Planners
Location
Los Angeles, California
Size
93,000 Square Feet
Completion Date
2017
Delivery Method
Construction Manager at Risk
![UCLA Engineering VI Phase 2](/sites/default/files/styles/gallery_image/public/2023-03/DJI_0298a_jpg.jpg?itok=OMek8wyc)
![UCLA Engineering VI Phase 2](/sites/default/files/styles/gallery_image/public/2023-03/DJI_0309a_jpg.jpg?itok=PG5CUkW6)
UCLA Engineering VI- Phase 2 is a 93,000-square-foot research and academic building that completes the school’s six-building engineering school complex. The five-story building is located on a site adjacent to UCLA’s main entrance and interconnects with two other engineering facilities.