This project rebuilds the I-95/Route 630 interchange as a diverging diamond interchange with two parallel bridges carrying Route 630 over I-95. The project widens Route 630 from two lanes to four lanes for 1.9 miles and relocates the park-and-ride lot with doubled capacity.