Hayward Maintenance Complex Central Warehouse
Clark Civil constructed a 135,000-square-foot central warehouse building with exterior break areas, site improvements, and landscaping for Bay Area Rapid Transit (BART).
To make room for the new warehouse, Clark Civil demolished the old 120,000-square-foot warehouse structure and installed new vibrated stone column foundations. Clark Civil self-performed mass excavation and foundation concrete, as well as the installation of industrial storage racks, loading dock equipment, and HAZMAT structures.
The project team managed the full build-out of the warehouse including second story administrative office spaces and the HVAC, electrical, plumbing, fire protection, fire alarm, communication, and IT systems.
The project is designed to achieve LEED® Certification.