The 2100 Crystal Drive project transforms an office building into a 12-story, 265,000-square-foot hotel with 344 keys, two adjoining lobbies, a restaurant, and meeting spaces. Work involves selective structural demolition, façade enhancements, elevator modernization, and the installation of energy-efficient heat pump systems.