Client
Illinois Capital Development Board
Designer
Affiliated Engineers
Location
Elgin, Illinois
Completion Date
2025
Delivery Method
Design-Build
The Elgin Mental Health Center Replacement Power Plant is a new central utility power plant, including maintenance workspace and vehicle storage on the 53-building Elgin Mental Health Center Campus. Clark's scope of work includes the installation of three 500-horsepower medium-pressure, dual-fuel steam boilers and the relocation of one 1,200-horsepower steam boiler. Additional scope involves the installation of the three 1,500-watt, 2.4 kilovolt diesel generators to supply parallel power to the campus when the utility power is unavailable.
Awards
2025 CISCO New Construction Suburbs (Above $20M) Project of the Year