DCA Terminal A Improvements
The two-story, 12,000 square-foot addition required utility relocation to be coordinated with adjacent airport projects, selective demolition within the existing terminal, and approximately 200 auger cast piles. Inside the terminal, the Clark team furnished and installed joints between the new and existing buildings, MEP systems, a hydraulic elevator, two stairwells, and other interior finishes. The team also restored pavement striping and ground-level pathways at the conclusion of the project.