Client
Washington Metropolitan Area Transit Authority
Location
Maryland, Virginia, and Washington, DC
Completion Date
2020
Delivery Method
General Contracting
This project includes the procurement and installation of 34 transformers and 8 auxiliary transformers at traction power sub-stations within the District of Columbia, Maryland, and Virginia. Work includes the replacement of high-voltage alternating current and direct current switchgears, traction power transformers and rectifiers, voltage regulators, bus duct, supervisory and control data acquisition systems, and lighting fixtures.
Awards
2025 ENR MidAtlantic Award of Merit in Specialty Construction
2025 WBC Craftsmanship Award in Power Generation, Distribution and Switchgear