Lone Star 345 kV

Strengthening the Texas Transmission Grid
Location: 
Meridian, Texas
Client: 
Lonestar (NextEra); Blattner Engery; Team Power Group (Line Contractor)
Architect: 
Peak Power
Contract Value: 
$10,500,000
Year Completed: 
2013
Expertise: 

As a part of the Competitive Renewable Energy Zones projects throughout Texas, Atkinson Power was contracted through the Team Power Group to supplement production during the installation of 345kV conductor in a broader effort to integrate significant renewable energy generation into the grid.

Atkinson's scope included the installation of 62.7 miles of bundled 1590 ACSS-TW Falcon double circuit 345 kV transmission line, one 7#7 Alumoweld shield wire, and one 48 Optical Ground Wire on a combination of both concrete and steel poles.

Atkinson Power utilized Summit Helicopters to string the lead line onto the towers for the entire 63-mile length, which allowed the project to meet the pressing project completion deadline.

  • ClarkBuilds
    ClarkBuilds Ice cream and K'Nex to finish a long day on the jobsite. Thank you to all our little engineers for an amazing… t.co/ImiPrvn6PD
    April 27
  • ClarkBuilds
    ClarkBuilds From building paper facades to laying bricks, our little engineers have really had a productive day on the jobsite!… t.co/4JK3IZcTLj
    April 27