Lucky Shot involves the rehabilitation of an abandoned exploratory drift at a gold ore deposit and the construction of a new access drift and a drill station.
The scope of work includes enlarging a 700-linear-foot drift, stabilizing a known fault zone, and excavating and supporting a 2,500-linear-foot heading drift and crosscut intersection drift. Ground support consists of spot bolting, pattern bolting, welded wire fabric, and shotcrete.