Hayward Maintenance Complex Central Warehouse

Location: 
Hayward, CA
Client: 
The Bay Area Rapid Transit District (BART)
Architect: 
AECOM-TSE
Size: 
135,000 Square Feet
Year Completed: 
2019
Sector: 

The Bay Area Rapid Transit District (BART) has awarded Clark Civil a contract for the BART Hayward Maintenance Complex Central Warehouse project in Hayward, CA. AECOM-TSE, JV is the project designer. This is Clark Civil’s third project with BART.

Clark Civil will construct a 135,000-square-foot central warehouse building with exterior break areas, site improvements, and landscaping. To make room for the new warehouse, Clark Civil will demolish the old 120,000-square-foot warehouse structure and install new vibrated stone column foundations. Clark Civil will self-perform mass excavation and foundation concrete, as well as the installation of industrial storage racks, loading dock equipment, and HAZMAT structures. The project team will manage the full build-out of the warehouse including second story administrative office spaces and the HVAC, electrical, plumbing, fire protection, fire alarm, communication, and IT systems.

The project is designed to achieve LEED® Certification. Construction is underway and completion is slated for November 2019.