Route 7 and Route 659 Interchange

Ashburn, Virginia
One Loudoun Holdings, LLC
Contract Value: 
Year Completed: 
Shirley will construct a new grade-separated interchange carrying Ashburn Village Boulevard over Route 7 along a new alignment directly to the east of the existing signalized intersection. As part of the project scope, Shirley’s team will be responsible for all bridge and road construction, utility relocations, maintenance of traffic, water and sewer, box culvert extensions, sidewalks, and trails. This project is the sixth interchange that Shirley has constructed between Leesburg and Route 28. 
Design and engineering was completed by Dewberry Consultants, LLC, as part of a previous contract between Shirley and One Loudoun 
Construction is scheduled for completion in 2018.